Product Detail :
|
Operation of 5 Nos. Cesspool Emptier Through Contractually Engaged Driver and Helper for Three Years. Construction of Under Ground Cable Duct Along Esplanade East Row Footpath (northern Side) From Bentinck Street to Hemanta Basu Sarani Crossing in Ward 46. Construction of Pathway Along the Bank of Tollys Nullah From Shantinagar Bridge to Kudghat Bridge By Concrete Paver Block Including Allied Beautification Work in Connection with Pollution Abatement of Tollys Nullah in Ward No 97. Construction of Pathway Along the Bank of Tollys Nullah From Bansdroni Bridge to Suryanagar Iron Bridge By Concrete Paver Block Including Allied Beautifiction Work in Connection with Pollution Abatement of Tollys Nullah in Ward No 98.
|