Product Detail :
|
Work of safety measures which include fabrication and installation of grills in turbine area on unsafe trenches in unit 3 & 4. work of servicing and maintenance of lt circuit breakers installed at unit-3 and unit-4 cstps during coh/aoh of units or as and when required basis. work of erai dam premonsoon maintenance of radial gates and its operating gearboxes, butterfly valve g/b and emergency isolating gate servicing, seppage gallery dewatering (submersible) pump replacement, platform repairing at erai dam site. / annual maintenance contract for work of all risk operation & maintenance of ac plant u¬5,6 & 7 cstps. manufacture, design, supply, replacement and fitment of seals for hot air gates of unit 8&9, cstsp. supply of fuel pipe and centre feed pipe for xrp 1043 coal mill at unit 8&9 cstps. work of replacement of high pressure valves and repairing of hfo heating/ steam tracing lines installed at unit-9 boiler, cstps.
|